The engineering question
Tower construction requires checks across changing equipment and operating conditions.
The approach
SimWE created a Simdroid application for parameterised modelling and force analysis of erection equipment.
What the source reports
The source describes a consultation solution for comparing construction conditions.

Read the source
English summary prepared by Simhub from SimWE’s publication. The project is attributed to the organisations named above.
SimWE original · English and Chinese Chinese version